Bid check list

Scroll down to learn more
✓
Allocation – and RFP tracker updated
✓
Head of Operations set up bid team
✓
Kick-off meeting
✓
Work-in-progress deck shared with the full bid team from day 1
✓
Everyone should be inputting their contributions into the shared deck* to help with version control
✓
Check-in once all elements have been drafted for review before graphics from COO or CEO – this includes live links to any demos or examples
✓
Any word documents, Foleon or videos to be put into a shared OneDrive folderwith the bid team for review
✓
Graphic design should be completed 2 days before submission
✓
Pricing should be signed off by the COO if more than £100k, 2 days before submission
✓
QA by COO or CEO to be completed 2 days before submission
✓
Editing should be done on the final day before submission and all links checked and content in videos

* Input to the live document should stop the moment the shared deck is sent to graphics, but can recommence once the graphically-treated version is re-shared**.

**with a caveat that a final graphics pass may be needed for new content added after that point.